Cooperative Agreement for CESU-affiliated Partner with Colorado Plateau Cooperative Ecosystem Studies Unit
Opportunity Identification: G24AS00282
Opportunity summary
The Geological Survey in the science and technology and other research and development sector is offering a public funding opportunity titled "Cooperative Agreement for CESU-affiliated Partner with Colorado Plateau Cooperative Ecosystem Studies Unit" and is now available to receive applicants. Interested and eligible applicants and submit their applications by referencing the CFDA number(s): 15.808. This funding opportunity was created on 2024-02-27. Applicants must submit their applications by 2024-04-05. (Agency may still review applications by suitable applicants for the remaining/unused allocated funding in 2026.) Each selected applicant is eligible to receive up to $499,999.00 in funding. Eligible applicants include: Others.
The US Geological Survey (USGS) is soliciting proposals under a cooperative agreement for a partner organization affiliated with the Colorado Plateau Cooperative Ecosystem Studies Unit (CESU). This opportunity supports science and technology research focused on sediment resources and channel substrates in the Colorado River through Grand Canyon National Park, with an emphasis on understanding how fine sediment, especially sand, is stored, moved, and redistributed within the Colorado River ecosystem. Because the award is issued through the CESU program, eligibility is limited to entities that are already participating partners in the Colorado Plateau CESU network, which is designed to link federal agencies with qualified research and technical institutions to deliver applied science, monitoring, and education.The central goal of the project is research and long-term monitoring of the magnitude and direction of change (trends) in fine-sediment storage in the Grand Canyon reach of the Colorado River. A major part of this work is tied to high-flow experiments (HFEs), which are controlled releases from Glen Canyon Dam intended to mobilize and redeposit sand to build or maintain sandbars. The project calls for tracking how individual HFEs affect sandbars and sand conservation, while also evaluating the cumulative effects of multiple HFEs over time, including what happens in the periods between HFEs under normal dam operations. In practice, this implies repeated measurements and analyses that can distinguish short-term event responses from longer-term trajectory, helping managers understand whether successive experiments are sustaining sandbar resources or whether gains are being lost between events.
Another major theme is investigating the link between dam operations, sand transport, and eddy sandbar dynamics. Eddy sandbars form in recirculating flow zones along riverbanks and are key features for camping beaches, riparian habitat, and overall geomorphic condition in the canyon. The opportunity highlights the need to better understand how operational decisions at the dam (including timing and magnitude of releases) translate into transport conditions in the river corridor and, ultimately, the building, erosion, or stabilization of eddy sandbars. This type of work typically blends field observations with hydrologic and sediment-transport interpretation so that observed sandbar change can be connected to the underlying drivers.
The third research component focuses on monitoring changes in channel-bed sediment composition. Beyond tracking exposed sandbars, the project emphasizes the riverbed itself, including the presence and role of submerged aquatic vegetation. By documenting how the bed surface and near-bed sediments change through time, the work aims to improve understanding of how much sand is stored in the channel, not just on shorelines, and how that storage shifts with operations and sediment supply. These data are also intended to feed into physical habitat suitability modeling being conducted in other efforts, meaning the deliverables are expected to be useful beyond geomorphology alone and to support broader ecological and habitat assessments.
Administratively, the opportunity is identified as Funding Opportunity Number G24AS00282 under CFDA 15.808 and is categorized as discretionary funding with a cooperative agreement instrument, indicating substantial federal involvement is likely during the project (for example, coordination on study design, data standards, field logistics, or interpretation). The funding opportunity was created on 2024-02-27 and had an original closing date of 2024-04-05. The maximum award amount listed is $499,999. The sponsoring agency is the USGS within the Department of the Interior, and the work is explicitly scoped to Grand Canyon National Park and the Colorado River ecosystem within that corridor.
Frequently asked questions
What is this funding opportunity?
This is a US Geological Survey (USGS) funding opportunity to support science and technology research on sediment resources and channel substrates in the Colorado River through Grand Canyon National Park. The work is issued as a cooperative agreement under the Colorado Plateau Cooperative Ecosystem Studies Unit (CESU).
Who is the sponsoring agency?
The sponsoring agency is the US Geological Survey (USGS), within the Department of the Interior (DOI).
What is the Funding Opportunity Number?
The Funding Opportunity Number is G24AS00282.
What CFDA number is associated with this opportunity?
The opportunity is associated with CFDA 15.808.
What type of funding is this?
It is categorized as discretionary funding.
What is the award instrument?
The award instrument is a cooperative agreement, which generally indicates substantial federal involvement during the project (for example, coordination on study design, data standards, field logistics, or interpretation).
Who is eligible to apply?
Eligibility is limited to entities that are already participating partners in the Colorado Plateau CESU network. The opportunity is specifically soliciting proposals from a partner organization affiliated with the Colorado Plateau CESU.
What is the CESU program and why does it matter for eligibility?
The Cooperative Ecosystem Studies Unit (CESU) program is designed to link federal agencies with qualified research and technical institutions to deliver applied science, monitoring, and education. Because this award is issued through the CESU program, only organizations that are existing partners in the Colorado Plateau CESU network are eligible.
What is the geographic focus of the work?
The work is explicitly scoped to the Colorado River through Grand Canyon National Park, focusing on the Colorado River ecosystem within that corridor.
What is the primary scientific focus of the project?
The project focuses on fine sediment (especially sand) and how it is stored, moved, and redistributed within the Colorado River ecosystem in the Grand Canyon reach. This includes sand resources, channel substrates, and related river corridor geomorphic conditions.
What is the central goal of the project?
The central goal is research and long-term monitoring of the magnitude and direction of change (trends) in fine-sediment storage in the Grand Canyon reach of the Colorado River.
How are high-flow experiments (HFEs) related to this project?
A major part of the work is tied to high-flow experiments (HFEs), which are controlled releases from Glen Canyon Dam intended to mobilize and redeposit sand to build or maintain sandbars. The project calls for tracking how individual HFEs affect sandbars and sand conservation, as well as evaluating cumulative effects of multiple HFEs over time.
What does the project aim to learn about individual HFEs versus multiple HFEs over time?
The project is intended to distinguish short-term responses to individual high-flow events from longer-term trends. It also evaluates whether successive HFEs are sustaining sandbar resources over time, and whether gains are being lost during periods between HFEs under normal dam operations.
What are the expected monitoring and analysis characteristics implied by the scope?
The scope implies repeated measurements and analyses over time, with enough consistency to separate event-driven sandbar responses (during HFEs) from longer-term trajectory (including between-HFE periods under normal operations).
What is the focus on dam operations, sand transport, and eddy sandbar dynamics?
A major theme is investigating how dam operations (including timing and magnitude of releases) influence sand transport conditions and, in turn, the building, erosion, or stabilization of eddy sandbars along riverbanks in the canyon.
What are eddy sandbars and why are they important in this opportunity?
Eddy sandbars form in recirculating flow zones along riverbanks. They are highlighted as key features for camping beaches, riparian habitat, and overall geomorphic condition in the Grand Canyon river corridor.
Does the opportunity include work on the channel bed, not just exposed sandbars?
Yes. A third research component focuses on monitoring changes in channel-bed sediment composition, emphasizing the riverbed itself in addition to exposed sandbars.
Is submerged aquatic vegetation part of the channel-bed monitoring component?
Yes. The channel-bed component explicitly includes the presence and role of submerged aquatic vegetation as part of documenting how the bed surface and near-bed sediments change through time.
Why is channel-bed sediment composition monitoring important to the stated goals?
Documenting changes in the bed surface and near-bed sediments is intended to improve understanding of how much sand is stored in the channel (not just on shorelines) and how that storage shifts with operations and sediment supply.
How are the results expected to be used beyond geomorphology?
The opportunity states that the data are intended to feed into physical habitat suitability modeling being conducted in other efforts, so deliverables are expected to support broader ecological and habitat assessments as well.
What is the maximum award amount?
The maximum award amount listed is $499,999.
When was the funding opportunity created?
The funding opportunity was created on 2024-02-27.
What was the original closing date?
The original closing date was 2024-04-05.
What kind of federal involvement should applicants expect?
Because this is a cooperative agreement, substantial federal involvement is likely. The opportunity specifically notes examples such as coordination on study design, data standards, field logistics, or interpretation.
What broad types of work are emphasized?
The opportunity emphasizes applied research and long-term monitoring, including field observations and hydrologic and sediment-transport interpretation to connect observed sandbar change to operational and transport drivers.
What management-relevant questions is the project intended to help answer?
Based on the stated scope, the work is intended to help managers understand how controlled releases (HFEs) and normal dam operations influence sandbar building and erosion, whether sandbar gains persist between events, and how sand storage shifts both on shorelines and within the channel bed over time.
Questions about this opportunity?
Contact ohiogovernmentgrants.org for help with this listing or similar funding opportunities.
Contact ohiogovernmentgrants.orgRelated funding listings
Applicants who have applied for this opportunity (G24AS00282) also looked into and applied for these: